NEW QUESTION # 58
In powder coatings, when the particles of powder begin to flow but are not fully liquid, they are in what stage?
- A. Wetting stage
- B. Cure stage
- C. Gel stage
- D. Flow stage
Answer: D
NEW QUESTION # 59
Coating surveys may include which steps?
Select All That Apply:
- A. Schedule the remedial work
- B. Summarize the collected data
- C. Develop a survey plan
- D. Evaluate the coatings performance
Answer: A,B,C,D
NEW QUESTION # 60
You are the NACE Coating Inspector on a tank lining project and are asked to perform a high voltage holiday test after the coating applicators have completed their final repairs. After meeting all the confined space entry permit you enter the tank and notice a very strong odor of solvent.
Your first course of action should to:
- A. Exit the tank and document the incident in your daily report
- B. Investigate to find the source of the odor
- C. Exit the tank and immediately and report the problem to the nearest safety supervisor
- D. Don your air supplied respirator and continue the testing
Answer: C
NEW QUESTION # 61
Which is used to calibrate a pH meter?
- A. Deionized water
- B. Distilled water
- C. Standard buffer solution
- D. Standard solvent solution
Answer: C
NEW QUESTION # 62
The main reason dehumidification is used during coating operations is to
- A. allow the contractor to guarantee the completion date.
- B. reduce the possibility of missing the recoat window.
- C. control the environment
- D. avoid repetitive blasting/coating operations.
Answer: C
NEW QUESTION # 63
All of these are advantages of using repair patches EXCEPT
- A. barrier to moisture and corrosion.
- B. excellent abrasion resistance.
- C. inert to common acids, alkalis, and solvents.
- D. special tools or equipment are required.
Answer: D
NEW QUESTION # 64
Non-Conformance Reports are designed to:
- A. Elevate the status of the Inspector
- B. To identify items that do not meet the specification requirements
- C. Assist the Owner in negotiating credits from the Contractor
- D. Punish the Contractor for substandard work
Answer: B
NEW QUESTION # 65
An Inspection and Test Plan is required when:
- A. When the Inspector requests one
- B. When the Owner specifies one
- C. When the Coating Applicator requests one
- D. It is always required
Answer: D
NEW QUESTION # 66
When NACE/SSPC WJ 1 is referenced; what type of equipment would the Inspector expect to see on the job:
- A. Water Jetting Equipment
- B. Abrasive Blasting Equipment
- C. Power Tools
- D. Scarifiers
Answer: A
NEW QUESTION # 67
When performing a hardness test on a coating which has elastic properties the inspector is likely to likely to observe:
- A. A very low reading
- B. Cold flow or creep
- C. No difference from any other coating
- D. A very high reading
Answer: B
NEW QUESTION # 68
In which type of concrete are laitance commonly encountered?
- A. Concrete block (poured with a form)
- B. Glass fiber cement
- C. Poured (wet cast)
- D. Gunite
Answer: C
NEW QUESTION # 69
Inspection and Test Plans are provided to:
- A. So the contractor has a single document to reference
- B. So the Inspector doesn't have to read the entire specification
- C. Outline the inspection steps, sequencing and pass/fail criteria
- D. To supersede the requirements of the product data sheets
Answer: C
NEW QUESTION # 70
The number of air turns in an enclosure can be affected by all of these EXCEPT
- A. manufacturer of the equipment.
- B. type of dehumidification equipment (refrigerant or desiccant).
- C. coating type.
- D. time of the year (winter/summer).
Answer: C
NEW QUESTION # 71
You have just your NACE CIP Level 2 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:
- A. Advise the prospective employer that you cannot accept the position
- B. Accept assignment without hesitation
- C. Meet with the prospective employer to scope of your role
- D. Review the NACE Attestation prior to making a decision
Answer: D
NEW QUESTION # 72
When performing inspection in accordance with ASTM D 4138 the Inspector will use:
- A. A destructive paint inspection Tooke gauge
- B. A set of 14 pencils of varying hardness
- C. A hardness tester
- D. A mechanical adhesion tester
Answer: A
NEW QUESTION # 73
When completing the Final Inspection report the Inspector should write the report using:
- A. Language that the most would understand
- B. Language that another NACE Inspector would understand
- C. Language that only technical experts would understand
- D. Language that only in the project would understand
Answer: A
NEW QUESTION # 74
Cold-applied tape
- A. is typically green or led and looks like "painted" finish.
- B. are identifiable by its distinct colors, usually light blue, green, Or Grey.
- C. is polyethylene film, heat laminated, 'With an adhesive layer of butyl glue.
- D. have a cross-linked polyethylene backing and a heat-activated adhesive.
Answer: C
NEW QUESTION # 75
The best choice of instrument for holiday testing of thick film concrete coatings is:
- A. High Voltage AC
- B. High Voltage DC Pulse Type
- C. Low Voltage Sponge Type
- D. High Voltage DC Constant Current
Answer: D
NEW QUESTION # 76
Corrosion is the reverse process of
- A. flaking.
- B. steel manufacturing.
- C. galvanic deterioration.
- D. hot dipping.
Answer: B
NEW QUESTION # 77
NACE Level 2 Inspectors have been authorized to perform:
- A. Visual inspection only
- B. Visual inspection, Non-Destructive and Destructive testing
- C. Visual inspection and Non-destructive testing
- D. All types of inspection without supervision
Answer: B
NEW QUESTION # 78
Examples of non-ferrous metals include
Select All that Apply:
- A. copper
- B. iron
- C. aluminum
- D. mild steel.
Answer: A,C
NEW QUESTION # 79
......
Achieving certification as a coating inspector level 2 can help professionals advance their careers and increase their earning potential. Employers often require or prefer candidates who hold a NACE certification, as it demonstrates a high level of knowledge and expertise in the field. Additionally, certification can provide professionals with opportunities for networking, professional development, and career growth.