OG0-093 Free Certification Exam Easy to Download PDF Format 2023 [Q96-Q121]

Share

OG0-093 Free Certification Exam Easy to Download PDF Format 2023

Get 100% Success with Latest The Open Group Certification OG0-093 Exam Dumps


Conclusion

OG0-093 is one of the most complex exams because it is a combination of both Part 1 and Part 2 certification tests. However, it is a great way to earn the TOGAF 9 Certified at once instead of taking the two parts separately. The test also helps the professionals to gain an upper hand in the industry by showing their expertise with the TOGAF framework.

 

NEW QUESTION 96
A key step in validating a proposed target architecture is to consider what may have been forgotten. What technique does TOGAF recommend to address this issue?

  • A. Business Transformation Readiness Assessment
  • B. Capability-Based Planning
  • C. Business Value Assessment Technique
  • D. Communications and Stakeholder Management
  • E. Gap Analysis

Answer: E

 

NEW QUESTION 97
Scenario:
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that speicializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.
A challenge that the company is facing to scale up the number of vehicles coming off the production line to meed customer demand, while maintaining quality. At the moment there are supply chain storages for key electronic components related to the autonomous drive system. In response the this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common off-the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.
Refer to the Scenario
The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer's concern.
Based on the TOGAF standard, which of the following is the best answer?

  • A. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
  • B. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • C. You use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs.
    As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
  • D. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.

Answer: A

 

NEW QUESTION 98
In which ADM phase does the value and change management process determine the circumstances under which the Enterprise Architecture is permitted to change after deployment?

  • A. Phase H
  • B. Preliminary Phase
  • C. Phase G
  • D. Phase E
  • E. Phase F

Answer: A

Explanation:
Section: Part 1
Explanation
Explanation/Reference: http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap14.html

 

NEW QUESTION 99
In which ADM phase is the Implementation and Migration Plan coordinated with other frameworks?

  • A. Phase H
  • B. Phase F
  • C. Phase G
  • D. Phase A
  • E. Phase E

Answer: B

 

NEW QUESTION 100
Complete the sentence.
A good set of architecture principles that cover every situation perceived throughput the enterprise meet
the recommended criteria of____

  • A. consistency
  • B. completeness
  • C. robustness
  • D. stability
  • E. understandability

Answer: B

Explanation:
Explanation/Reference:
Reference: http://pubs.opengroup.org/architecture/togaf91-doc/arch/chap23.html

 

NEW QUESTION 101
Scenario:
Please read this scenario prior to answering the question
You are the Lead Enterprise Architect in a company that specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. The company has manufacturing facilities located in Illinois, Nebraska, and Manitoba. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturer's design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics.
However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and improved blade longevity. The company has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
TOGAF 9 and its Architecture Development Method (ADM) are used to develop the automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies.
Recently, a pilot architecture project was completed at a single location that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Architecture Board approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new Automated Test System controller for each location. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each location to ensure consistency.
Refer to the Scenario
You have been asked to recommend the best approach to address the Chief Engineer's concern.
Based on TOGAF 9, which of the following is the best answer?

  • A. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.
    You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • B. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.
    You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • C. You create an Architecture Contract to manage and govern the implementation and migration process.
    If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.
    You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.
  • D. You use the issued Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of the completed blade assembly at each location and develop change requirements if necessary.
    You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.

Answer: D

 

NEW QUESTION 102
Which section of the TOGAF template for Architecture Principles should highlight the business benefits for adhering to the principle?

  • A. Statement
  • B. Rationale
  • C. Name
  • D. Implications

Answer: B

 

NEW QUESTION 103
Which of the following is a technique recommended by TOGAF to help identify and understand requirements?

  • A. Architecture Maturity Models
  • B. Mind Maps
  • C. Gap Analysis
  • D. Business Scenarios
  • E. SWOT Analysis

Answer: D

Explanation:
Section: Part 2

 

NEW QUESTION 104
Scenario:
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that specializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the Internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.
A challenge that the company is facing to scale up the number of vehicles coming off the production line to meet customer demand, while maintaining quality. At the moment there are supply chain storages for key electronic components related to the autonomous drive system. In response to this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common off- the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.
Refer to the Scenario
The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer's concern.
Based on the TOGAF standard, Version 9.2, which of the following is the best answer?

  • A. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.
    You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • B. You use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.
    You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
  • C. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.
    You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • D. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.
    You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.

Answer: D

Explanation:
Section: Part 2

 

NEW QUESTION 105
Scenario
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for an enterprise architecture project team within a leading multinational pharmaceutical and medical devices manufacturer. Its brands include numerous household names for medications and first aid supplies.
The company has a long history of innovating new treatments for many common illnesses and diseases. Prior to launching a new treatment, the company has to demonstrate Its effectiveness and safety in a set of clinical trials that satisfy the regulatory requirements of the countries in the target markets. All clinical trials are undertaken by its research laboratories, which employ over 10,000 people at separate facilities in the United Kingdom, United States, Sweden, France, Canada, India, China and Japan. In addition to internal research and development activities the company is also involved in publicly funded collaborative research projects, with other industrial and academic partners.
The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.
The Enterprise Architecture group within the company has been engaged in an architecture development project to create a secure networked collaboration system that will allow researchers at its product development laboratories worldwide to share information about their clinical trials. This system will also connect with external partners.
The Enterprise Architecture group is a mature organization. They use the TOGAF 9 ADM with extensions required to support current good manufacturing practices and good laboratory practices in their target markets. Due to the highly sensitive nature of the information that is managed, special care was taken to ensure that each architecture domain included an examination of the security and privacy issues that are relevant.
The Executive Vice President for Clinical Research is the sponsor of the Enterprise Architecture activity. She has stated that the changes to the enterprise architecture for the new system will need to be rolled out in stages on a regional basis that minimizes disruptions to ongoing clinical trials.
Refer to the Scenario
You have been asked to recommend the approach to identify the work packages that will be included in the Transition Architecture(s).
Based on TOGAF, which of the following is the best answer?

  • A. Group the Solution Building Blocks from a Consolidated Gaps, Solutions and Dependencies Matrix into a set of work packages. Using the matrix as a planning tool, regroup the work packages to account for dependencies. Sequence the work packages into the Capability Increments needed to achieve the Target Architecture. Schedule the rollout one region at a time. Document the progression of the enterprise architecture using a state evolution table.
  • B. Determine the set of Solution Building Blocks required by identifying which Solution Building Blocks need to be developed and which need to be procured. Eliminate any duplicate building blocks. Group the remaining Solution Building Blocks together to create the work packages using a CRUD matrix. Rank the work packages in terms of cost and select the most cost-effective options for inclusion in a series of Transition Architectures. Schedule the roll out of the work packages to be sequential across the geographic regions.
  • C. Use a Consolidated Gaps, Solutions and Dependencies Matrix as a planning tool. For each gap classify whether the solution is either a new development, purchased solution, or based on an existing product. Group the similar solutions together to define the work packages. Regroup the work packages into a set of Capability Increments to transition to the Target Architecture taking into account the schedule for clinical trials.
  • D. Create an Implementation Factor Assessment and Deduction Matrix and a Consolidated Gaps, Solutions and Dependencies Matrix. For each gap, identify a proposed solution and classify it as new development, purchased solution, or based on an existing product. Group similar solutions together to form work packages. Identify dependencies between work packages factoring in the clinical trial schedules. Regroup the packages into a set of Capability Increments scheduled into a series of Transition Architectures.

Answer: C

 

NEW QUESTION 106
Which of the following statements best describes the Requirements Management process?

  • A. It is used to dispose of, address and prioritize architecture requirements
  • B. It is used to develop requirements for Transition Architectures that deliver business value
  • C. It is used to review business requirements
  • D. It is used to manage architecture requirements throughout the ADM cycle
  • E. It is used to establish requirements for Phase A

Answer: D

Explanation:
Section: Part 1

 

NEW QUESTION 107
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for the enterprise architecture team at the prime contractor for the
Dreadnought Unmanned Aircraft System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited
numerous different procurement processes and related IT systems. The decision has been made to
consolidate and reduce redundant procurement processes and systems. The CEO has announced that the
company will seek to leverage higher volume discounts and lower related IT support costs by instituting a
preferred supplier program.
TOGAF 9 Is used for internal Enterprise Architecture activities, with an iterative approach for executing
Architecture Development Method (ADM) projects.
At present, there are no particularly useful architectural assets related to this initiative, so all assets need
to be acquired and customized or created from scratch. The company prefers to implement commercial off
the shelf package applications with little customization. The CIO, who is the project sponsor, has stated
that she is not concerned about preserving existing processes or systems.
The architect-re development project has put in place Its Architecture Capability for this project and has
started a number of iteration cycles to develop the Architecture. Some tasks to address concerns related
to the Business Architecture have been completed. The next immediate task is to address the Information
Systems Architectures.
The Information Systems Architectures must address stakeholder concerns such as:
1. Which procurement-related business processes are supported by zero, one, or many existing
applications?
2. What non-procurement applications will need to be integrated with any new procurement applications?
3. What data will need to be shared?
Refer to the Scenario
[Note: You may need to refer to TOGAF 9 Chapter 35 in order to answer this question.]
You have been asked to identify the most appropriate catalogs, matrices, and diagrams for this situation.
Based on TOGAF 9, which of the following is the best answer?

  • A. In the early iterations of Architecture development, you would describe the Baseline Application
    Architecture with a Technology Portfolio catalog, and describe the Baseline Data Architecture with a
    Data diagram. In the later iterations of Architecture development, you would describe the Target
    Application Architecture with a System/Technology matrix, and describe the Target Data Architecture
    with a Data Dissemination diagram.
  • B. in the early iterations of Architecture development, you would describe the Baseline Application
    Architecture with a System/Function matrix, and describe the Baseline Data Architecture using a Data
    Entity/Data Component catalog. In the later Iterations of the Architecture Definition, you would describe
    the Target Application Architecture using Application Communication diagrams and an Application
    Interaction matrix, and describe the Target Data Architecture with a System/Data matrix.
  • C. In the early iterations of Architecture development, you would describe the Target Application
    Architecture with Application Communication diagrams and an Application Interaction matrix, and
    describe the Target Data Architecture with a Data Entity/Business Function matrix and a System/Data
    matrix. In the later iterations of Architecture development, you would describe the Baseline Application
    Architecture with a System/Function matrix, and describe the Baseline Data Architecture with a Data
    Entity/Data Component catalog.
  • D. In the early iterations of Architecture development, you would describe the Target Application
    Architecture with Application Communication diagrams and an Application Interaction matrix, and
    describe the Target Data Architecture with a System/Data matrix. In the later iterations of Architecture
    development, you would describe the Baseline Application Architecture with an Application and User
    Location diagram and a System/Function matrix, and describe the Baseline Data Architecture with a
    Data Entity/Data Component catalog.

Answer: C

Explanation:
Explanation/Reference:
In this the company prefers to implement commercial off the shelf package application with little
customization and not concerned about preserving existing processes or systems.
Reference: 19.4 Approaches to Architecture Development.

 

NEW QUESTION 108
What technique does TOGAF recommend that focuses on achieving business outcomes rather than just technical deliverables?

  • A. Capability-Based Planning
  • B. Business Transformation Readiness Assessment
  • C. Quality Function Deployment
  • D. Business Value Assessment Technique
  • E. Communications and Stakeholder Management

Answer: A

 

NEW QUESTION 109
Scenario
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for an Enterprise Architecture project team within a multinational oil and gas corporation. It is organized into two major business groupings:
-Upstream operations which include exploration for crude oil and natural gas and operating the infrastructure necessary to deliver oil and gas to the market.
-Downstream operations which include the manufacturing, distribution and marketing activities for oil products and chemicals Safety is a priority for the company, with the aim to ensure id causes zero harm to people and the environment.
The company has to satisfy the regulatory requirements of each of the countries it operates in.
The downstream business generates a third of the company's profits worldwide and includes more than 30,000 petrol stations and various oil refineries. In some countries it also includes oil refining, a retail station network, lubricants manufacture and marketing, industrial fuel and lubricants sales. The practice for the downstream business has been to operate locally managed by local "operating companies".
The Governing Board is concerned about the risk posed by operating in this complex global environment with a large part of the downstream business represented by local operating companies. As a result, the Chief Executive Officer (CEO) has appointed a Chief Compliance Officer (CEO) to be responsible for overseeing and managing compliance issues for the corporation. The CCO reports directly to the CEO.
The CCO has approved the expenditure of resources to establish an Enterprise Architecture program, and has mandated the use of the TOGAF standard as the framework. He has requested to be informed about the status of downstream operations that could impact regulatory compliance. He also wants the corporate legal staff and auditors to analyze all proposed new downstream operations to ensure that they are within the legal guidelines for each country. In addition, the local operating companies should be able to see that the architecture is appropriate for their needs.
The architecture project team has worked within the sponsor to complete a detailed Request for Architecture Work providing the high level project description. As the project commences the next phase, the necessary approvals from corporate and line management have been .....
Refer to the Scenario
You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Chief Compliance Officer, legal staff, auditors and the local operating companies.
Based on the TOGAF standard, which of the following is the best answer?

  • A. You recommend that an analysis of the stakeholders is undertaken, including development of a Stakeholder Map. This will allow the architectures to define groups of stakeholders who have common concerns. The concerns and relevant viewpoints should be defined for each group of stakeholders, and recorded in the Architecture Vision document.
  • B. You recommend that the ArchiMate modeling language is used to create a set of models that can be applied uniformly across all architecture projects. Each architecture should then be defined based on this fixed set of models. All concerned parties can then examine the models to ensure that their needs have been addressed.
  • C. You recommend that a set of models be created for each project architecture that can be used to ensure that the system will be compliant with the local regulations. A formal review should be held with the stakeholders to verify that their concerns have been properly addressed by the models.
  • D. You recommend that a Communications Plan be created to address the powerful and influential stakeholders. This plan should include a report that summarizes the key features of the architecture with respect to each location and reflect the stakeholders' requirements. You will check with each stakeholder that their concerns are being addressed.

Answer: A

 

NEW QUESTION 110
Scenario:
Please read this scenario prior to answering the question
Your role is that of a consultant to the Lead Enterprise Architect in a company that speicializes in luxury electric cars and their powertrain components, and also produces battery-charging equipment. It has its own distribution network, its own showrooms, and sells directly to customers via the internet. The company has four manufacturing facilities, two in the North America, one in Europe, and one in Asia.
A challenge that the company is facing to scale up the number of vehicles coming off the production line to meed customer demand, while maintaining quality. At the moment there are supply chain storages for key electronic components related to the autonomous drive system. In response the this, the research arm of the company has pioneered the development of a new self-driving platform. This new design uses common off- the-shelf components that will allow for a significant increase in overall vehicle production. This new design is ready to go into production.
The company has a mature Enterprise Architecture practice that is supported by a cross-functional Architecture Board. The TOGAF standard is used for developing the automated manufacturing process and systems used to design, manufacture and test the new design. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
As part of putting the new self-driving platform into production, adjustments to the automated assembly processes need to be made. A pilot architecture project at a single location has defined an updated approach for controlling the automated test systems used to perform final quality assurance. The Chief Engineer, sponsor of the activity, and the Architecture Board have approved the plan for immediate implementation at each plant.
Architecture Contracts have been developed that detail the work needed to implement and deploy the new automated test system controller for each location. The Chief Engineer has expressed concern that a uniform process be employed at each location to ensure consistency and quality.
Refer to the Scenario
The Lead Enterprise Architect has asked you to recommend the best approach to address the Chief Engineer's concern.
Based on the TOGAF standard, which of the following is the best answer?

  • A. You review the applicable Architecture Contract for each location, ensuring that it addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. In cases where the contract is issued to an external party, you ensure that it is a legally enforceable contract.
    You schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • B. You use the Architecture Contracts to manage the architecture governance processes for the project across the locations. You deploy monitoring tools to assess the performance of each completed drive assembly at each location and develop change requirements if necessary.
    You recommend that if a deviation from the contract is detected, the Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition.
  • C. You create an Architecture Contract to manage and govern the implementation and migration process at each location. For internal development projects, you issue a memorandum of understanding between the Architecture Board and the implementation organization. For contracts issued to an external party, you ensure that it is a fully enforceable legal contract.
    You ensure that the Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
  • D. You create an Architecture Contract to manage and govern the implementation and migration process. If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Architecture Board and the implementation organization.
    You recommend that if a deviation from the Architecture Contract is detected, the Architecture Board grant a dispensation to allow the implementation organization the ability to customize the process to meet their local needs.

Answer: D

Explanation:
Section: Part 2

 

NEW QUESTION 111
Complete the sentence. The Architecture Landscape is divided into levels known as _________________.

  • A. Solution, Foundation, and Corporate Architectures
  • B. Segment, Strategic, and Capability Architectures
  • C. Gaps, Plateaus, and Target Architectures
  • D. Transitional, Complete and Incremental Architectures
  • E. Baseline, Transition, and To Be Architectures

Answer: B

Explanation:
Section: Part 2

 

NEW QUESTION 112
Complete the sentence. The Business Transformation Readiness Assessment technique is primarily focused on ___

  • A. determining if the organization is ready to accept change
  • B. planning the migration steps needed to achieve the transformation
  • C. ensuring that there are adequate trained developers and engineers to implement the solution
  • D. ensuring that there is sufficient financial capacity to execute the desired transformation
  • E. determining if there is adequate stakeholder support for the implementation process

Answer: A

Explanation:
Section: Part 2

 

NEW QUESTION 113
According to TOGAF, which one of the following best describes an enterprise architecture?

  • A. The highest level of architecture that can be achieved in a given organization
  • B. An architecture of a commercial organization
  • C. An architecture that consists of more than one subsidiary company The Open Group.com
  • D. An architecture that crosses multiple systems, and multiple functional groups within the enter-prise

Answer: D

 

NEW QUESTION 114
Which of the following best describes TOGAF?

  • A. A system development lifecycle method for software engineering
  • B. A process model, best practices and assets to aid production, use and maintenance of enterprise architectures
  • C. An abstract framework for the development of standards and processes for a business architecture
  • D. A collection of components organized to accomplish a specific set of functions
  • E. A reference model containing taxonomy defining terminology for an enterprise architecture, together with an associated graphic

Answer: B

Explanation:
Section: Part 1

 

NEW QUESTION 115
Which section of the TOGAF template for Architecture Principles highlights the requirements for carrying
out the principle?

  • A. Implications
  • B. Statement
  • C. Name
  • D. Rationale

Answer: A

 

NEW QUESTION 116
Which of the following describes the Architecture Vision document?

  • A. A joint agreement between the development team and sponsor on the deliverables and quality of an architecture
  • B. A high level description of the baseline and target architectures
  • C. A detailed schedule for implementation of the target architecture
  • D. A description of individual change increments showing progression from the baseline to target architecture
  • E. A set of rules and guidelines to support fulfilling the mission of the organization

Answer: B

 

NEW QUESTION 117
Complete the sentence. According to the TOGAF standard, an ___________ is a representation of a system from the perspective of a related set of _______________.

  • A. architecture viewpoint, stakeholders
  • B. architecture view, requirements
  • C. architecture view, concerns
  • D. architecture view, stakeholders
  • E. architecture viewpoint, architecture views

Answer: C

Explanation:
Explanation
Reference https://pubs.opengroup.org/architecture/togaf9-doc/arch/chap03.html

 

NEW QUESTION 118
Which of the following best describes the Integrated Information Infrastructure Reference Model?

  • A. It is a deliverable from Phase A
  • B. It focuses on Application Software
  • C. It is used to determine the capability level of an enterprise
  • D. It supports all the Common Systems Architectures
  • E. It provides a conceptual structure for architecture governance

Answer: B

 

NEW QUESTION 119
Which part of TOGAF describes a step-by-step approach to developing an enterprise architecture?

  • A. Enterprise Continuum & Tools
  • B. Architecture Content Framework
  • C. Architecture Capability Framework
  • D. Architecture Development Method
  • E. ADM Guidelines and Techniques

Answer: D

Explanation:
Section: Part 1

 

NEW QUESTION 120
In which phase of the TOGAF ADM are Gap Analysis results from earlier phases consolidated?

  • A. Phase H
  • B. Phase D
  • C. Phase E
  • D. Phase G
  • E. Phase F

Answer: C

Explanation:
Section: Part 1

 

NEW QUESTION 121
......

Get Ready to Pass the OG0-093 exam Right Now Using Our The Open Group Certification Exam Package: https://buildazure.actualvce.com/TheOpenGroup/OG0-093-valid-vce-dumps.html