C-TS422-2504 Questions Pass on Your First Attempt Dumps for SAP Certified Associate Certified [Q17-Q37]

Share

C-TS422-2504 Questions Pass on Your First Attempt Dumps for SAP Certified Associate Certified

C-TS422-2504 Practice Test Pdf Exam Material

NEW QUESTION # 17
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

  • A. You can use trigger points to automatically create rework orders via confirmations.
  • B. You can use the production scheduling profile to automatically set orders to technically complete.
  • C. You can use mass processing to read PP master data for production orders.
  • D. You can use mass processing to set production orders to technically complete.

Answer: A,D


NEW QUESTION # 18
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?

  • A. Back flushing
  • B. Production order release
  • C. Material requirements planning
  • D. Kanban

Answer: C


NEW QUESTION # 19
What does forecasting in the dem planning cycle include? Note: There are 3 correct answers to this question.

  • A. Oneoff events
  • B. Past quotation quantities
  • C. Market intelligence
  • D. Past production planning quantities
  • E. Past sales order quantities

Answer: A,C,E


NEW QUESTION # 20
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.

  • A. They are created with exact times in Advanced Planning.
  • B. They are created together with the independent requirement for the finished product.
  • C. They are only created for multilevel bill of material (BOM) structures.
  • D. They are created on the assembly level during the planning run.

Answer: A,D


NEW QUESTION # 21
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

  • A. Opening period
  • B. Setup time
  • C. Total replenishment lead time
  • D. Float after production

Answer: B,D


NEW QUESTION # 22
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Routings
  • C. Bill of material
  • D. Production order

Answer: B,C


NEW QUESTION # 23
What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question.

  • A. Integrate clean core practices in the endtoend value process chain.
  • B. Establish release management.
  • C. Establish regular housekeeping tasks procedures.
  • D. Define roles responsibilities as part of a process transformation office.
  • E. Establish an organizational structure technical foundation transformation methodology for clean core.

Answer: B,D,E


NEW QUESTION # 24
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Setup time
  • B. Pick time
  • C. Processing time
  • D. Wait time
  • E. Float before production

Answer: A,C,D


NEW QUESTION # 25
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to identify material or capacity shortages in the billofmaterial structure after the production planning run
  • B. An evaluation that is ordered according to the network structure of all related products represents the coverage of issue elements with receipt elements stock
  • C. An evaluation to identify overstock situations in the balance between the receipt the issue elements after the production planning run
  • D. An evaluation that is ordered according to the billofmaterial structure of all related products represents the relationship between the receipt the issue elements

Answer: D


NEW QUESTION # 26
Which of the following are replenishment strategies for Kanban containers?
Note: There are 2 correct answers to this question.

  • A. Replenishment using process orders
  • B. Replenishment using direct transfer posting
  • C. Replenishment using planned independent requirements
  • D. Replenishment using reservations

Answer: B,D


NEW QUESTION # 27
What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

  • A. The Change Planning Direction indicator is set in the strategy profile.
  • B. The work center has several individual capacities.
  • C. Alternative work centers are fully occupied.
  • D. The Finite Scheduling indicator is NOT set in the strategy profile.

Answer: B,D


NEW QUESTION # 28
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?
Note: There are 2 correct answers to this question.

  • A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
  • B. Add the agreement to the quota arrangement mark it for MRP relevance.
  • C. Add the agreement to the source list mark it for MRP relevance.
  • D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

Answer: C,D


NEW QUESTION # 29
For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
  • B. The assigned routing bill of material (BOM) must be valid in the entire validity period.
  • C. The consistency check must be performed.
  • D. The lot size range must be within the lot size range of the assigned routing.
  • E. The assigned routing bill of material (BOM) must have the same validity period.

Answer: A,B,D


NEW QUESTION # 30
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

  • A. Planning strategy
  • B. Requirements type
  • C. Order type
  • D. Requirements profile

Answer: A,B


NEW QUESTION # 31
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.

  • A. Planning mode > Bucket
  • B. Planning mode > Order priority
  • C. Scheduling control > Close gap
  • D. Scheduling control > Find slot

Answer: A,D


NEW QUESTION # 32
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?

  • A. Process order management
  • B. Quality management
  • C. Engineering change management
  • D. Batch management

Answer: D


NEW QUESTION # 33
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. MRP creates a dependent requirement.
  • B. A sales order is created.
  • C. A sales order is delivered.
  • D. MRP creates a planned order.

Answer: B


NEW QUESTION # 34
What is the purpose of the pull list in material staging?

  • A. To control the flow of material from the supplier to the central storage location
  • B. To control the flow of material from the production storage location to the central storage location
  • C. To control the flow of material from the supplier to the production storage location
  • D. To control the flow of material from the central storage location to the production storage location

Answer: D


NEW QUESTION # 35
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question.

  • A. Planned orders (firmed)
  • B. Planned orders (unfirmed)
  • C. Production orders
  • D. ATP quantities

Answer: A,C


NEW QUESTION # 36
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?

  • A. SAP Signavio Process Manager
  • B. SAP Signavio Process Governance
  • C. SAP Signavio Process Intelligence
  • D. SAP Signavio Process Insights

Answer: A


NEW QUESTION # 37
......